Marina's Construction Overview
Throughout Southern Asia

American Marine and its partners have extensive experience with marina construction.  We understand the importance of a good
plan, a good design, and a repeatable process to specify the system, build components, test components, and deliver the
components to the work site for assembly.     

Overview of the Process:

1.  Planning the Project and determine specifications
2.  Selection of Piling Location and driving the piles
3.  Delivery and setup of the pontoons, stands cabling, and  moorings
4.  Connection of all system components
5.  Double check every Super Flex mooring line initial pre tension strength, if meet the civil engineer design after the 5 ~  
10 days of whole Install completed, and re-adjust it if necessary.
Offshore Mooring
Marina
2004 © American Marine, SUPFLEX® SYSTEMS, Patent No. 203.17.006.7 All Rights Reserved
2005 © American Marine, SUPERFLEX®, US Patent No. 6,899,050 B1.  All Rights Reserved
2006 © American Marine, SUPERFLEX® China Patent No. ZL 2003201005264 All Rights Reserved
2007 © American Marine, SUPERFLEX ® China Patent No. ZL 200520047348.2 All Rights Reserved
2008 © American Marine, SUPERFLEX ® -6 New Patent Pending All Rights Reserved
Breakwater Pontoon with Superflex Mooring System at Charlottetown Price Edward Island, Canada   2007.08.06